EPS alkali-resistant fiberglass mesh lines control the quality of paste
Alkali-resistant fiberglass mesh is placed in front of layout, all over 1.6mm uneven part EPS wall insulation board should be polished smooth, with a stainless steel trowel and then throughout the EPS wall insulation board evenly coated with the area slightly larger than the mesh of viscose pulp, thickness of 1.6 mm or so, then immediately pressed into alkali-resistant fiberglass mesh dope, and to the surrounding of the alkali-resistant fiberglass mesh cloth flattening process from the center, to avoid its folds. Corner wall, the side door and window openings, expansion joints, etc., play paving strengthen net. Strengthening the network in the corner of the bag should be continuous turn, ensure ≥200 mm width on each side. Must overlap each other between the alkali-resistant fiberglass mesh, lap length of not less than 100 mm, the thickness of the mortar should make alkali fiberglass mesh is completely embedded in mortar, to be hard, dry mortar by hand When can touch, and then apply a second channel trowel mortar.
After the finished work should be ready to protect exterior insulation and the sub-projects and sub-part project is completed. Exterior insulation project during construction and maintenance period should be avoided by rainfall, exterior sun angle and window and door openings should take protective measures to prevent stampede window; the spout should take anti-pollution measures should prevent the crash after the completion of the wall . EPS lines strictly related materials and construction processes Off the Road EPS wall insulation board and various auxiliary have strict quality standards, and requirements of the various materials compatibility between pomegranate is also very strict; exterior insulation and finish systems are for manual operation, the operation is very easy to cause the slightest mistake quality problems. Therefore, we must strictly.